Arbor Contracts Ltd
Home
Commercial
Industrial
Healthcare
Residential
Other Projects
Case Studies
Contact Us
Arbor Contracts Ltd
Home
Commercial
Industrial
Healthcare
Residential
Other Projects
Case Studies
Contact Us
More
  • Home
  • Commercial
  • Industrial
  • Healthcare
  • Residential
  • Other Projects
  • Case Studies
  • Contact Us
  • Home
  • Commercial
  • Industrial
  • Healthcare
  • Residential
  • Other Projects
  • Case Studies
  • Contact Us

Desborough College - Drainage Repairs and Associated Works

    Desborough College, 5 Shoppenhangers Road, Maidenhead SL6 2QB

    Client: Pioneer Educational Trust

    Project Value: £860,000

    Contract: JCT DB


    Works included

    • GPR (Ground Penetrating Radar) Survey – Detailed surveying of the site to identify existing underground services and drainage infrastructure, helping to ensure works are planned and carried out safely and efficiently.
    • Drain Clearance & Repairs – Professional clearance of blocked or restricted drainage systems, along with repair and maintenance of damaged or defective pipework.
    • Excavation Works – Controlled excavation to access existing drainage infrastructure and prepare areas for new installations or repairs.
    • New Underground Pipework – Installation of new underground drainage and pipework sections, including connections to existing systems where required.
    • Ground Reinstatement & Resurfacing – Reinstatement of excavated areas, including suitable ground preparation and resurfacing to return the site to a safe, functional and professional finish.

    16-18 High Street - Internal Works, Roof Replacement and Elevation Repairs

      16-18 High Street, Brentwood, CM14 4AB 

      Client: JD Wetherspoon Plc

      Project Value: £910,000

      Contract: JCT MW  

        

      Works included 

      • Asbestos Floor Tile Removal – Safe removal and disposal of existing asbestos-containing floor tiles and associated materials in accordance with relevant regulations and industry requirements.
      • Roof Weathering & Insulation – Replacement of the existing weathering system to the lower roof and roof overrun, incorporating new insulation to improve the performance and longevity of the roof structure.
      • New Insulated Felt Roof System – Installation of a new insulated felt roofing system, providing a durable and weather-resistant finish.
      • Rainwater Goods – Replacement of defective rainwater goods, ensuring effective collection and discharge of rainwater from the roof areas.
      • Walkway & Handrail Works – Removal of the existing walkway and installation of a new freestanding handrail system to improve safety and accessibility.
      • Brickwork Repairs – Comprehensive brickwork repairs, including installation of new parapet coping, structural stitching bars and repointing to affected areas.
      • External Staircase Repairs – Repair and refurbishment of the existing external metal staircase, including preparation and redecoration to provide a durable and improved finish.
      • Electrical Installation – Installation of new electrical services throughout the first floor, including a new consumer unit, small power outlets and lighting installations.
      • Fire Alarm Installation – Installation of a new fire alarm system to the first floor, providing improved fire detection and life safety provisions.
      • Fire-Rated Ceiling – Installation of a new fire-rated ceiling system to the first floor to enhance fire protection and compartmentation.
      • Tea Point & Sanitary Facilities – Installation of a new tea point, together with new sanitaryware and associated fittings to two toilets.
      • Flooring – Installation of new floor finishes throughout the stairs, kitchen and toilet areas.
      • Internal Decoration – Complete decoration of the first floor and staircase, including preparation and finishing works to provide a clean, modern and professional appearance.

      Unit D, 51 Lime Street - Internal Refurbishment

            

        Unit D, 51 Lime Street, London, EC3M 7DQ

        Client: St Martins Property Investment Ltd

        Project Value: £151,000 

        Contract: JCT DB


        Works included 

        • Dry Lining Installation – Installation of dry lining to the rear blockwork wall, providing a clean, durable and finished internal surface ready for decoration.
        • Suspended Lighting Installation – Supply and installation of a suspended lighting system, providing effective and practical illumination throughout the space.
        • Accessible WC Installation – Installation of a fully accessible WC incorporating DDA-compliant sanitaryware, fixtures and fittings, designed to meet accessibility requirements.
        • Raised Access Flooring – Installation of a raised access floor system to create a level, finished floor area while providing convenient access to underlying services.
        • Ventilation System – Detailed design and installation of a mechanical ventilation system to provide effective air circulation and ventilation.
        • Small Power Installation – Installation of small power fittings and associated electrical provisions to meet the requirements of the completed space.
        • Decorations & Finishing – Completion of internal decoration works, including preparation and finishing to provide a clean, professional and high-quality final appearance.

        Copyright © 2026 Arbor Contracts Ltd - All Rights Reserved.

        • Privacy Policy

        Powered by

        This website uses cookies.

        We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

        DeclineAccept