Unit D, 51 Lime Street, London, EC3M 7DQ
Client: St Martins Property Investment Ltd
Project Value: £151,000
Contract: JCT DB
Works included
- Dry Lining Installation – Installation of dry lining to the rear blockwork wall, providing a clean, durable and finished internal surface ready for decoration.
- Suspended Lighting Installation – Supply and installation of a suspended lighting system, providing effective and practical illumination throughout the space.
- Accessible WC Installation – Installation of a fully accessible WC incorporating DDA-compliant sanitaryware, fixtures and fittings, designed to meet accessibility requirements.
- Raised Access Flooring – Installation of a raised access floor system to create a level, finished floor area while providing convenient access to underlying services.
- Ventilation System – Detailed design and installation of a mechanical ventilation system to provide effective air circulation and ventilation.
- Small Power Installation – Installation of small power fittings and associated electrical provisions to meet the requirements of the completed space.
- Decorations & Finishing – Completion of internal decoration works, including preparation and finishing to provide a clean, professional and high-quality final appearance.